Difference between revisions of "Project Apollo for Orbiter"

From OrbiterWiki
Jump to navigation Jump to search
Line 83: Line 83:
 
==Supported Spacecraft==
 
==Supported Spacecraft==
  
NASSP 7.0 supports a number of spacecraft.
+
NASSP 7.0 supports a number of spacecraft. Most are historical spacecraft used in the Apollo program, but some are proposed post-Apollo designs which never flew in the real world.
  
 
===Command/Service Module===
 
===Command/Service Module===

Revision as of 12:55, 17 August 2006

NASA's Apollo Space Simulation Project is an Addon for Orbiter which recreates the Apollo missions.

Background

NASSP was originally developed by Jean-Luc Rocca-Serra, who released the source code to version 4.x. Mark Grant then rewrote the code as C++, added an initial C++ implementation of the Apollo Guidance Computer and replaced the control panel bitmaps, releasing 'NASSP COSTAM' and a derivative which provided basic support for the Virtual AGC software.

Jean-Luc released NASSP 5.0, an updated version based on that source code, for the next release of Orbiter, including, for example, new particle exhaust support and a Skylab launch module.

With the 6.x release it became Project Apollo for Orbiter, an open source Apollo simulation add-on: for simplicity, both software variants are described here as NASSP. The latest 'stable' version is 6.4.3.

The 7.0 release is currently in Beta, including a near-complete simulation of the Command Module control panel and most of the internal systems, and support for new spacecraft. It is also capable of flying most of an Apollo mission using the Virtual AGC software.

Features

As there is no definitive list of functionality changes between NASSP versions, many of these changes have been deduced from release documentation and test-flying of versions which are still available for download.

Early NASSP

List To Be Compiled...

NASSP 3.x

  • Saturn 1b and ASTP support.
  • Rewritten to use Orbiter docking support.

As a side-note, NASSP 3.0 still runs under Orbiter 2006, with no modifications required.

NASSP 4.x

  • Control Panel for both Saturn V and Saturn 1b.
  • LEM Panel available.
  • Engine Gimbal control for all rocket stages, Service module and LEM.
  • Totally rewritten Autopilot (a semi auto mode is available for engine control only).
  • New Saturn V and Saturn 1b meshes.
  • Optional high-res Saturn V and Saturn 1b meshes.
  • Docking system enhancement etc...

NASSP 5.x

NASSP 5.0 control panel
  • New CSM and LEM meshes. Only high-res meshes supported for the Saturn 1b and Saturn V.
  • New control panels with illumination support from P64.
  • Skylab.
  • Exhaust particle streams.
  • New exhaust textures.
  • C++ AGC implementation for launch and TLI.
  • Rewritten in C++, to eliminate bugs and crashes due to global variable use.
  • Revised launch autopilot for increased accuracy.
  • Same functionality level for Saturn V and Saturn 1b.
  • NASSP-specific solar system configuration.

NASSP 5.x does not currently run under Orbiter 2006 as its Solar System files are incompatible with the new Orbiter format. It could probably be made to run with some changes to the config files.

NASSP 6.x

  • Rebuilt for 2005 Orbiter release.
  • Basic virtual cockpit view.
  • Initial support for unmanned Saturn test flights.
  • More SIVB payloads.
  • Basic LEM ascent autopilot.
  • Improved AGC emulation.
  • Improved Saturn 1b autopilot.

NASSP 7 (beta)

NASSP 7.0 control panel
  • Fully functional 2D Panel Support throughout the CM.
  • 3D Virtual Cockpit (nonfunctional at the moment)
  • Full Realism Simulation of most major spacecraft systems.
  • Historically accurate checklists.
  • NEW CM, SM, and KSC meshes (VAB,LUT,LC34/37/39,MSS,MLP,Crawler etc.)
  • Integrated VirtualAGC.
  • Full launch and landing autopilot for the LEM, and enhanced autopilot for the Saturns and CSM.
  • Meshland integration.
  • Engineering camera views during launch.
  • Realism settings to accomodate orbinauts from 9 to 92!
  • Support for low-res Saturn 1b and Saturn V meshes as well as high-res.

...and MORE!

Supported Spacecraft

NASSP 7.0 supports a number of spacecraft. Most are historical spacecraft used in the Apollo program, but some are proposed post-Apollo designs which never flew in the real world.

Command/Service Module

NASSP simulates the Block II Command/Service Module, providing a home and life support for the astronauts in space.

The CM was the nerve center of the Apollo spacecraft, as it functioned as primary control and navigation platform during the missions. It housed the highly-advanced (for the 1960s) Apollo Guidence Computer, as well as all the systems the astronauts would need to safely reenter earth's atmosphere.

The Service Module contained the systems that were vital for the extended stay of up to 10 days in space. This included fuel cells to privide power and water, as well as radiators to keep the internal systems cool. Also housed in the service module were the primary propulsion systems, including the RCS maneuverability thrusters and the SPS, used for major course corrections. In later Apollo lunar missions, this versitile component contained a SIM Bay for additional scientific study of the lunar surface the space surrounding our nearest celestial neighbor.

As the core of the Apollo hardware, the CSM is a high priority for NASSP development. It has recieved a complete and ongoing overhaul for NASSP 7.0, complete with new graphics, meshes and systems simulations.

Lunar Module

The Lunar Module was a two-stage lander used to land astronauts on the Moon and return them to orbit.

The lower Descent Stage carried the large Descent Engine, fuel for the landing, and batteries and supplies required for the stay on the Moon. It also carried a limited amount of cargo, including, on the later flights, the Lunar Rover. It's final role was to act as a launch pad for the Ascent Stage when the lunar landing phase was complete and they flew back to dock with the CSM in orbit.

The upper Ascent Stage provided living quarters for the crew while on the Moon, controls for the landing and ascent, and the smaller Ascent Engine and fuel to carry them into orbit. The Ascent Stage could dock with the CSM itself, but in normal circumstances the docking was flown by the more maneuvrable CSM.

Whereas the CSM was the brain and body, the LM was the heart of the Apollo Program. A high priority has been placed on the development of the LM for NASSP. It is currently in line for new graphics and meshes. Work is already underway on its internal systems.

Lunar Rover

Electrically-powered rover used by the astronauts to drive around the lunar surface.

NASSP's LRV recently got an overhaul with the inclusion of a VC mesh and new animations are on the drawing board.

Saturn V

Three-stage launcher used to launch a Command/Service Module and Lunar Module towards the Moon. This was used to launch Apollo's 8 through 17. It is arguably the most powerful rocket ever flown into space.

The Saturn V in NASSP is a highly detailed and increasingly more realistic machine. Current development is minimal, as it has already reached a high level of detail and accuracy.

Saturn 1b

Two-stage launcher used to launch a Command/Service Module into Earth orbit. This was used for Apollo 7, the Skylab flights, and the Apollo-Soyuz Test Project flight. Recent studies have shown that the Saturn 1b may have been one of the most cost-effective boosters in lbs per dollar.

Like the Saturn V, NASSP's Saturn 1b is highly detailed and extremely accurate. As a result, it is not a high priority at this time.

ASTP Docking Module

Although rather limited as a spacecraft in its own right, the Apollo-Soyuz Test Program Docking Module allows an Apollo Command/Service Module to dock with a Russian Soyuz spacecraft in orbit, and transfer crew between them. The Docking Module is carried into orbit as cargo on a Saturn 1b, in the same way that the Lunar Module is carried as cargo on a Saturn V.

Development on the Docking Module is currently stalled as work proceeds on higher-priority items, however it is open to further development and will more likely than not see it's share of upgrades.

'Apollo to Venus' Wet Workshop test

'Wet Workshop' test SIVB burn

NASA's Manned Venus Flyby plans using Apollo technology would have used an SIVB stage to launch a three-man crew towards Venus, after which they would vent remaining fuel from the SIVB, extend solar panels and live in it as a Skylab-style space station. They would conduct generalised astronomical and zero-gravity experiments for most of their trip, and for a few days around the flyby they would conduct detailed observations of Venus.

NASSP 7.0 includes a simulation of the first test phase, in which the astronauts would use the SIVB to raise their orbit for a test of the 'wet workshop' of up to one month in duration. Rather than solar panels, the test phase uses batteries in the SIVB stage to provide power to supplement the Service Module fuel cells and conserve consumables in the Service Module for the return to Earth.

Although not a historically real mission, this proposal from the Apollo Applications Program is an intriguing and exciting 'fictional' mission. NASSP is developing this capability both as a historical curiosity and as research/exploration into the feasibility of such a concept.

Saturn INT-20

Saturn INT-20

Two-stage launcher used in a similar manner to the Saturn 1b to launch a Command/Service Module and larger payload into Earth orbit: essentially a cut-down Saturn V with no second stage, mounting an SIVB stage directly on top of the S1C first stage. The S1C also had one engine removed, as the five-engine stage produced too much thrust and would have caused problems with excessive dynamic pressure during launch.

The primary benefit of the INT-20 was a payload capacity about half-way between the Saturn 1b and Saturn V without the cost of creating a new launcher from scratch: the stages were close enough in design that they could be built on the same production line as the Saturn V stages. A three-engine version with a lower payload was also studied, but isn't simulated in NASSP.

Another non-historic craft, the INT-20 showed much promise on the drawing board and NASSP hopes to bring such promise to life in the virtual world.

Future spacecraft

There are a number of candidates for future additions to the spacecraft simulated in NASSP.

Apollo to Venus

Phases of 'Apollo to Venus' flyby plans

Phase B of the Apollo to Venus plan called for the addition of solar panels to the 'wet workshop' and the use of a Block III CSM so that the astronauts would fly the SIVB into a high altitude orbit for a year-long mission in preparation for an actual fly-by.

Phase C of the Apollo to Venus plan would use an improved version of the 'wet workshop' SIVB with a Block-IV CSM to perform the actual Venus flyby.

Command/Service Module

Support may be added for the proposed Block-III CSM with batteries for power in place of fuel cells, and the Block-IV CSM with batteries for power and LEM engines in place of the SPS.

In addition, the inclusion of a Block-I CSM in future versions has been discussed.

Long-Range Flyer/Lunar Escape System

Long Range Flyer

Simple two-man rocket using fuel from the LEM. This could be used for scouting missions to sites up to around 50 miles from the main landing site, or, in an emergency, to carry two astronauts from the lunar surface to rendevouz with the CSM.

Lunar Motorbike

Tentatively planned for Apollo 20. See NASA image.

Project Able LEM

A plan to use a mirror in space to light up parts of the Vietnam jungle at night. A modified LEM with a huge flexible mirror attached would be launched into space where the mirror would unfold.

A similar plan proposed using a modified LEM to fly to Soviet satellites and spray paint over their censors: effectively the first space vandals.

Project Icarus

Proposal to divert or destroy an incoming asteroid by launching 100 Megaton nuclear bombs on Saturn Vs.

Saturn 1

The Saturn 1 was the precursor to the Saturn 1b, using an SIV stage in place of the SIVB. The SIV was smaller, with a lower fuel capacity, and used multiple RL10 engines in place of the J2 engine on the SIVB.

Saturn 1b MLV

As part of NASA's cost-cutting plans, they studied a derivative of the Saturn 1b which would replace the S1B stage with a solid rocket similar in size to a shuttle SRB. In essence this was a 1960s version of NASA's new 'Stick' launcher for the CEV.

Saturn INT-21

Two-stage launcher used to launch large payloads into Earth orbit. This was used for the Skylab mission.

Saturn S-ID stage

A modified S1C stage which dropped the outer four engines in a similar manner to the Altas dropping two of its engines during launch. As well as multi-stage launchers with greater payloads, it could carry 50,000 pounds to low orbit itself with no second stage.

Saturn V-24

Saturn V with stretched stages, new toriodal aerospike engines on the upper stages, uprated F-1 engines on the first stage, and four strap-on boosters with two F-1 engines each. Capable of putting over 500,000 pounds of payload into low Earth orbit.

Skylab

The NASSP 5.x Skylab sources were lost, so a new version will be required once the INT-21 support is added.

Comparative screenshots

NASSP has changed significantly over the years, as models, textures and control panels were updated, historical accuracy was improved and new special effects were added.

NASSP 3.x Saturn 1b Launch
NASSP 3.x Saturn V Launch
NASSP 3.x CSM docked with LEM and SIVB
NASSP 3.x Saturn 1b Launch
NASSP 3.x Saturn V Launch
NASSP 3.x CSM docked with LEM and SIVB
NASSP 4.x CSM and LEM
NASSP 4.x CSM and LEM orbit Moon
NASSP 4.x crew post-splashdown
NASSP 4.x CSM and LEM
NASSP 4.x CSM and LEM orbit Moon
NASSP 4.x crew post-splashdown
NASSP 6.x Apollo 11 launch
NASSP 6.x Saturn V first stage seperation
NASSP 6.x lunar module on Moon
NASSP 6.x Apollo 11 launch
NASSP 6.x Saturn V first stage seperation
NASSP 6.x lunar module on Moon
NASSP 7(beta) Saturn 1b Launch
NASSP 7(beta) Tower Seperation
NASSP 7(beta) SM Breakup
NASSP 7(beta) Saturn 1b Launch
NASSP 7(beta) Tower Seperation
NASSP 7(beta) SM Breakup

Historical documents

A number of historical documents have been used in NASSP development. A selection of the more important ones are:

External links